If the workload, the working days or the vacation entitlement change, create a new workload with an effective date in TimeStatement – instead of overwriting the old one. This article explains how to proceed and the typical error messages when time has already been recorded.
Basics: How do I set up an employee's work plan?
Basic rule: new workload instead of overwriting
Each workload entry applies from its start date. If something changes (e.g., from 80% over five days to 80% over four days, from an hourly wage to a monthly salary with fixed target hours, a new vacation entitlement), then:
- Open Management → Users → [person] → Work plan → Target Working Hours Definition.
- Click Create Workload (don't "break" the existing workload by editing it if time entries are already based on it).
- Under Start, set the effective date from which the new arrangement applies (e.g., 10/01).
- Distribute the target hours across the new working days, set the workload and, if needed, the "Vacation Days per Year (100%)" field.
- Save. Leave earlier workloads unchanged so that historical balances stay correct.
Important: Don't delete earlier workloads, and avoid changing them retroactively in a way that requires already closed periods to be recalculated – this can lead to incorrect vacation and hours balances.
Error message about days that have already been closed
The message "This entry overlaps with a day that has already been closed. Please check the start date and adjust it if necessary." appears when you try to save a workload that affects days for which work time has already been recorded or days have been closed (e.g., switching to a monthly salary as of the first of the month even though check-ins were already recorded that month).
Here's what to do:
- Don't delete existing check-ins just to be able to save the workload.
- Check which start date is still possible: often the first date without closed bookings or the next open day.
- Create the new workload with this effective date and the correct target hours from then on.
Typical change scenarios
Changing working days (e.g., 5 → 4 days)
Create a new workload with an effective date and distribute the weekly hours across the new days. A retroactive change is only needed if the past should also be recalculated – otherwise, the effective date of the contract change is enough.
Adjusting the vacation entitlement (e.g., 25 → 20 days)
- Open the current workload under Target Working Hours Definition.
- Adjust the "Vacation Days per Year (100%)" field and save.
- Then check the vacation period under "Target Vacation" and any carryovers.
If the new entitlement only applies from a specific date, a new workload with that start date is clearer than a silent change in the middle of a running period.
From an hourly wage without a fixed plan to a monthly salary with target hours
Create the first fixed workload from the contractual start date. If saving is blocked because time has already been recorded, choose a permitted effective date.
Checklist before saving
- Effective date = first day of the new arrangement
- Daily hours and workload % match the contract
- "Vacation Days per Year (100%)" field checked
- Old workloads stay in place
- Also update the weekly work plan (magic wand template) for fixed working hours
Related articles
Note: This guide uses the terms of the English TimeStatement interface. If you use TimeStatement in another language or region, some menu and field names may differ.
Comments
0 comments
Please sign in to leave a comment.